The 8 apartments tucked away in Shanthi Colony promise a lifestyle that is in keeping with Lancor’s signature standards of quality.

RERA Registration number: TN/29/Building/0170/2017

*Sold Out

PROJECT HIGHLIGHTS

CONFIGURATION:

3 BHK Apartments

STATUS:

Sold Out

(*T&C Apply)

Lancor Project Featured

Location address:

Lancor Sri Hari,
Shanthi Colony, Anna Nagar,
Chennai 600040,
Tamil Nadu, India
Lancor Project Featured

STRUCTURE

  • RCC framed structure with RC foundations conforming to Bureau of Indian Standards (BIS).
  • Pre constructional anti-termite treatment will be provided under the Foundation and external perimeter of the building as per BIS for the complete building.
  • Walls will be constructed using Autoclaved Aerated Concrete blocks (AAC blocks) – from Aerocon or equivalent. Corners of walls will be protected using GI mesh and finished. The height will be maintained at 10’0” from structural floor to floor.

WALL FINISHES

  • Internal walls will be finished with cement plaster, gypsum and emulsion paint above Wall putty.
  • The toilet walls will be finished with imported ceramic tiles upto ceiling height – colors and sizes will be as recommended by Architects. Trims and profiles will be used to protect the vertical edges of tiles
  • Wash area will be finished with imported ceramic tiles upto ceiling height using tiles as recommended by our Architects.
  • Dado of 2’ above the kitchen platform will be finished with imported ceramic tiles.
  • Lofts will be provided in Kitchen and in one bedroom.
  • Exterior faces of the building including the balconies will be finished with cement plaster and weather proof paint – Apex or equivalent – texture paint will be used in certain areas as suggested by our Architects.

CEILING

  • Ceiling areas of living, dining, bedrooms, kitchen and balconies will be finished with putty and emulsion paint. Ceiling areas of toilets, wash area & common areas will be finished with gypsum and cement paint.

FLOOR FINISHES

  • Living, Dining and Bedrooms will be finished with imported vitrified tiles of size 2’0”x2’0” – colors as suggested by Architects.
  • Kitchen, Utility, Balcony & Toilets will be finished with imported ceramic tiles as recommended by Architects.
  • 4” high skirting matching the floor tile will be provided wherever required.

COMMON AREA FINISHES

  • Staircase & lobbies will be finished with Polished Granite slab and Granite tiles
  • Staircase walls will be finished with imported ceramic tiles upto a height of 7’0” and areas above will be finished with gypsum and emulsion paint.
  • Car parks will be finished with Granolithic flooring. Driveways will be finished with Cement tiles – pattern will be as suggested by our Architects.

DOORS

  • MAIN DOOR – West African Teak Wood frame with 45mm thick shutter finished with Polyurethane Lacquer paint and suitable locks. Suitable wooden Architrave and a threshold will be provided for this frame.
  • BEDROOM DOOR – Seasoned Wooden frame with 32mm thick shutter finished with Polyurethane Lacquer paint with locks. Suitable architrave will be provided for these frames.
  • TOILET DOOR – Seasoned Wooden frame with 32mm thick shutter finished with Polyurethane Lacquer paint on one side and plain laminate finish on other side with locks.
  • WINDOWS UPVC sliding windows will be provided in all rooms with MS Grills.
  • FRENCH DOORS UPVC Sliding Type French doors will be provided.

KITCHEN

  • Counter top Platform (dry fixing) will be finished with 18mm thick granite slabs 2’0” wide. Stainless Steel Single bowl sink with drain board and a sink cock will be provided. Provision for fixing an refrigerator , exhaust fan (or chimney), ceiling fan, microwave and mixie will be made.
  • Wash area will have Single bowl Stainless steel sink(without drainboard) and provision for fixing washing machine will be made.

ELECTRICAL

  • Concealed insulated copper multi-strand wires will be provided with distribution board having MCBs. Necessary number of switches & sockets will be provided as recommended by our Consultant.
  • Telephone points will be provided in Living and Master Bedroom.
  • Empty conduits for TV points will be provided in Living and Master Bedroom.

TOILETS

  • All Sanitaryware will be of ‘White’ Color and suitable number of CP fittings (ROCA or equivalent) will be provided.
  • A Shower partition will be provided in Master bedroom Toilet
  • Overhead shower with divertor and spout will be provided in all toilets.
  • All toilets will have provision for connecting a Geyser and an Exhaust fan.
Lancor Project Master Plan

Typical Floor Plans

Key Plan

Unit 1

Unit 2

Typical Floor Plan

Stilt Floor Plan