TCP Altura - Phase 2

Premium 2 & 3 BHK Apartments in Sholinganallur
RERA Registration No: TN/01/Building/163/2019

 

PROJECT HIGHLIGHTS

Area:

3.5 Acres

Apartment Type:

2 and 3 BHK Apartments

Total Blocks:

4 Blocks (A,B,C,D)

Total Apartments:

335 Apartments

Phase 1 Sold Out:

153 Apartments - Blocks A, B

Phase 2:

C Block - Sold Out, D Block - Sold Out

Lancor Project Featured

First residential property in Chennai/TN to receive the EDGE certification, a green building rating program of IFC, world BANK group, administered by GBCI

Location address:

Lancor TCP Altura,
Model School Rd,
Sholinganallur,
Chennai, Tamil Nadu,
India -600119

Lancor Project Featured

STRUCTURE

  • RCC framed structure with RC foundations conforming to BIS.
  • Pre-constructional anti-termite treatment will be provided under Foundations, external
    perimeter of the building as per BIS for the entire building.
  • Walls will be constructed using Autoclaved Aerated Concrete Blocks (AAC Blocks) from Aerocon or equivalent. Corners of walls will be protected with GI mesh and finished. The height will be maintained at 9’10” from structural floor to floor.

WALL FINISHES

  • Internal walls will be finished with cement and gypsum plaster, painted above wall putty.
  • The toilet walls will be finished with ceramic tiles upto 7’-0” height – patterns and sizes will be as recommended by Architects. Trims and profiles will be used to protect the vertical edges of the tiles
  • Common areas will be finished with gypsum plaster and cement paint.
  • Dado of 2’-0” above the kitchen platform will be finished with ceramic tiles.
  • Lofts will be provided in Kitchen and one bedroom.
  • Exterior faces of the building (including the balconies) will be finished with cement plaster and paint as recommended by Architects.

CEILING

  • Ceiling areas of living, dining, bedrooms, balconies & Kitchen will be finished with Wall putty and paint. Ceiling areas of Toilets & other common areas will be finished with
    cement paint.

FLOOR FINISHES

  • Living, Dining & Bed rooms will be finished with Vitrified tiles – pattern and colors as suggested by Architects.
  • Kitchen, Balcony & Toilets will be finished with ceramic tiles.
  • 4” high skirting matching the floor tile will be provided wherever required.

COMMON AREA FINISHES

  • Staircase & Lobbies will be finished with Green Marble or Natural Stone as recommended by Architects. Staircase walls and Corridor will be finished with Gypsum plaster, wall putty and paint
  • Car parks and Driveways will be finished with Granolithic flooring.

MAIN DOORS

  • African teak wood frame with 40mm thick shutter, polished finish on both sides with
    locks. Suitable wooden architrave as recommended by Architect and a threshold will be provided for this frame.

BEDROOM DOORS

  • Seasoned wooden frame, 32mm thick shutter finished with enamel paint on both sides with locks will be provided.

TOILET DOORS

  • Seasoned wooden frame, 32mm thick shutter, finished with enamel paint on one side and laminate finish on the inner side.

WINDOWS

  • UPVC sliding windows will be provided in all rooms with M.S.Grills

FRENCH DOORS

  • UPVC Sliding Type French doors will be provided.

KITCHEN

  • Counter top Platform (dry fixing) will be finished with 18mm thick granite slabs 2’-0” wide. Stainless Steel Single Bowl sink with drain board will be provided
  • Provision for fixing washing machine will be made.

TOILET

  • All Sanitary ware will be of ‘White’ Color, CP fittings will be provided as suggested by Consultant.
  • Single lever divertor with overhead shower will be provided in all toilets.

ELECTRICAL

  • Concealed insulated copper multi-strand wires will be provided with distribution board having MCBs. Required Number of switches and sockets will be provided.
  • Empty conduits for a TV point will be provided in living room.
  • One telephone point will be provided in living room.

WATER

  • Bore wells will be provided at different locations. Water Treatment Plant will be provided as recommended by Consultant.
  • Underground RCC sump of suitable capacity for Borewell / WTP Treated water/ STP
  • Treated water will be provided.
  • Overhead tanks will be provided as recommended by Consultant.
Lancor Project Master Plan

Typical Floor Plans

Block C - Flat 05

Block D - Typical Floor

Block D - Flat 01 03 05

Block D - Flat 02 04 06

Block D - Flat 08 10

Block D - Flat 09 11

Block D - Flat 07

Block D - Flat 12

TCP Altura Phase 2 - 2 BHK Apartment Walk through